top of page

Abit of this and a bit of that

  • Writer: PJM
    PJM
  • Aug 11, 2020
  • 1 min read

Updated: Sep 22, 2020

It can sometimes take a moment to get your head around things when trying to make one production line out of two seperate lines that was set up at an overseas site that you had not viewed or inspected. Well done to Cliff & Russell who are leading the team to install this steel processing line out in western Sydney. The challenges of the original factory floor had been purposely made for a wet production environment was overcome with mounting all equipment on measured frames so the equipment was level. This also eliminated service trenches.

Delays due to COVID has put pressure on delivery milestones however progress has been praised by the customer considering the global environment.

Well done boys





 
 
 

Comments


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

Copyright M&M Autopak Pty Ltd   "Your engineering solution partners"

"When you want to know how things really work, study them when they're coming apart." William Gibson
bottom of page